Enter your system's running watts, expected duty cycle, and how many hours you want covered. Get a realistic battery count for keeping climate control running.

Your numbers

1 Project details Optional
Shown on your exported report. Leave blank to skip.
2 Your HVAC system
Check the unit's nameplate for an exact figure.
Percentage of time the compressor actually runs versus idles.
3 Backup duration

Try a different backup time

The same 3,500 W HVAC at a 50 percent duty cycle and 13.5 kWh battery size at 90 percent depth of discharge and 92 percent round trip efficiency as the tool above. Drag the slider to change the backup hours.

8 hours
Batteries needed
2
Nameplate size
16.91 kWh
Usable energy
14.00 kWh
30% duty cycle
10.14 kWh
40% duty cycle
13.53 kWh
50% duty cycle
16.91 kWh
60% duty cycle
20.29 kWh
70% duty cycle
23.67 kWh
100% duty cycle
33.82 kWh

Maths: average load is 3,500 W times a 50 percent duty cycle, which gives 1.75 kW. Usable energy is average load times the backup hours. Nameplate capacity is usable energy divided by 90 percent depth of discharge times 92 percent round trip efficiency. Battery count rounds the nameplate size up to whole 13.5 kWh batteries.

How it works

Three steps to sizing for HVAC

Step 1

Find your system's running watts

Check the outdoor unit's nameplate for an exact figure by tonnage. The whole home backup tool uses a similar default if you're sizing everything together.

Step 2

Estimate a realistic duty cycle

Duty cycle depends heavily on outdoor temperature and home insulation quality. Assume higher duty cycle for worst-case summer planning, lower for shoulder-season outages.

Step 3

Confirm inverter surge capacity

HVAC compressors need a surge-rated inverter to start reliably. The battery inverter pairing tool checks this separately from the battery capacity math here.

Duty cycle cuts the HVAC battery need in half

Hover or tap each part of the picture to see what it means.

ACdraw3,500 W Dutycycle50% Runtime8 hours Usableenergy14 kWh NAMEPLATE17 kWh BATTERIES2

Understanding HVAC backup sizing

Why duty cycle changes this calculation so much

A central air conditioner's nameplate running wattage represents power draw only while the compressor is actively working, not a continuous 24-hour figure. Duty cycle, the percentage of time the compressor actually runs, can range from 30% on a mild day to nearly 100% during extreme heat, a variability ENERGY STAR's efficiency ratings account for in how central AC systems are rated. Using continuous full-load wattage instead of a realistic duty cycle can overstate battery need by 2 to 3 times, leading to an oversized and needlessly expensive system. The battery oversizing risk calculator covers what happens when sizing runs too conservative.

Why HVAC dominates whole home backup calculations

Even accounting for duty cycle, central air conditioning typically remains the single largest load in a whole home backup system, often requiring more battery capacity than every other household circuit combined. This is the main reason whole home backup systems need significantly more batteries than critical loads only systems, consistent with load-breakdown data from the Department of Energy's residential HVAC guidance. The whole home backup tool shows this tradeoff across a full household load list.

Why compressor startup surge is a separate concern

HVAC compressor motors draw a brief but significant surge, sometimes called locked rotor amps, that can reach 2 to 3 times the running wattage for a second or two on startup. This affects which inverter can reliably start the system, not how much total battery capacity is needed, since the surge lasts only moments. Many modern inverters and battery systems include soft-start technology specifically to reduce this surge requirement. The battery inverter pairing tool addresses this distinction directly.

Cheaper alternatives to full central air backup

Backing up an entire central air system requires substantial battery capacity, which is why some homeowners choose to back up a single window unit or mini-split instead, cooling just one or two key rooms during an outage at a fraction of the battery cost. This partial approach trades whole-home comfort for a meaningfully smaller and less expensive system, a cost difference the quick financing comparison tool in our Financing category can help quantify. The partial home backup tool and peak shaving calculator both cover related lower-cost strategies.

What to do with this number next

Once you know your HVAC battery need, check the electric stove backup tool to confirm startup surge compatibility, or the battery storage size calculator to see how this load fits into your total system. The inverter startup surge for HVAC compressors specifically is covered in the inverter sizing for HVAC startup calculator in our Inverters & Equipment category.

Questions

Frequently asked

A 3,500 watt central air conditioner running at a 50% duty cycle for 8 hours on a hot day needs about 17 kWh of nameplate battery capacity, or roughly 2 batteries at 13.5 kWh each. This single load often drives the majority of a whole home backup system's total battery count.

Duty cycle is the percentage of time the compressor actually runs rather than sitting idle between cooling cycles. On a very hot day it might run 70 to 80% of the time, while on a milder day it might only run 30 to 40%, which significantly changes the actual energy consumed versus the nameplate running wattage.

Yes, HVAC compressors can draw 2 to 3 times their running wattage for a second or two on startup, sometimes called locked rotor amps. Many modern battery systems include soft-start technology or require a separate soft-start device to handle this surge without needing an oversized inverter.

Some homeowners choose to back up a single window or mini-split unit instead of central air, which draws a fraction of the power and can keep one or two rooms comfortable during an outage at a much lower battery cost. The peak shaving calculator covers a related strategy for managing HVAC load without full backup.